Charge Up Fairfax is a Fairfax County grant program that gives HOAs, condos, nonprofits, and places of worship free engineering assessments and up to $12,000 in reimbursement grants to install Level 2 EV chargers in shared parking areas. When stacked with Dominion Energy’s Level 2 EV Charging Program, a typical $30,000 installation can cost your organization as little as $5,000 out of pocket.
If your board has been debating EV chargers but keeps getting stuck on cost, this guide breaks down exactly how the program works, who qualifies, and how to get the most out of every available dollar.
Residents are asking. Boards are debating. Here’s how to move forward.
What Is Charge Up Fairfax?
Charge Up Fairfax is a Fairfax County program run by the Office of Environmental and Energy Coordination (OEEC) that helps community organizations install Level 2 EV charging stations in shared parking areas. The program provides two things most organizations need: free technical guidance and grant funding to offset installation costs.
According to Rama Miltry, Fairfax County’s Energy and Climate Action Manager who oversees the program:
“Fairfax County’s Charge Up Fairfax program helps communities install EV chargers in parking areas open to all residents of the community, whether it’s an HOA or other community organization. We provide free technical guidance, a free engineering assessment, and grant funding to offset the cost.”
Does My HOA or Organization Qualify for Charge Up Fairfax?
The Charge Up Fairfax program is open to any of the following organizations in Fairfax County with shared parking:
- Homeowner associations (HOAs)
- Condominium associations
- Cluster associations and co-ops
- Nonprofits
- Places of worship
If your organization has parking that residents, members, or guests use, you almost certainly qualify. Eligibility was expanded in 2025 to include places of worship and nonprofits, as the county recognized these organizations are increasingly important hubs for community EV charging access.
How Much Does It Cost an HOA to Install EV Chargers in Fairfax County?
This is the section most boards need to see. Charge Up Fairfax was designed to be combined with Dominion Energy’s Level 2 EV Charging Program. When stacked together, the math works in your favor.
| Incentive | What It Covers | Estimated Value |
|---|---|---|
| Charge Up Fairfax Grant | Reimbursement after installation | Up to $8,000 (standard) / Up to $12,000 (equity areas) |
| Dominion Energy Level 2 Program | ~50% of electrical make-ready costs | ~$15,000 on a $30K project |
| Your out-of-pocket cost | Remainder after both incentives | As low as ~$5,000 |
On a typical $30,000 installation, Dominion Energy covers approximately $15,000 in electrical infrastructure costs, and Fairfax County reimburses another $8,000 to $12,000 after the chargers are operational. That leaves your organization with as little as $5,000 in net cost for a complete, professionally installed EV charging system.
As Miltry notes: “We have an informal partnership with Dominion Energy’s Level 2 program, which can cover 50% of your electrical make-ready costs on top of our grant.”
Grant amounts were increased in 2025. These are the strongest incentives the program has offered since it launched.
Ready to see what your project would cost? The application is free and takes minutes.
How Does the Charge Up Fairfax Process Work?

One of the most common reasons organizations delay is uncertainty about what the process actually involves. Here’s how it works from start to finish:
- Apply online. The application is 100% free with no deadline and takes minimal time to complete. Fairfax County responds within 10 to 15 business days.
- Free site visit and engineering assessment. Once accepted, an engineering firm visits your property at no cost. They evaluate your parking layout, power sources, and any site-specific challenges.
- Receive your feasibility study. The county provides a complete feasibility study including estimated costs, recommended charger placement, and required electrical work. As Miltry puts it: “The feasibility study costs nothing and commits you to nothing. You just learn what it would take.” This study alone is worth several thousand dollars.
- Decide whether to move forward. After reviewing the feasibility study, your board decides whether to proceed. There’s no pressure and no penalty if you don’t.
- Hire a contractor to handle the installation. If you move forward, you hire a licensed EV charging contractor such as Blue Whale EV to manage equipment selection, permitting, electrical upgrades, and installation.
- Get reimbursed after installation. Once your chargers are installed and operational, you submit documentation and receive your reimbursement grant from Fairfax County.
Have questions about any step? Contact Blue Whale EV to talk through your project.
Why Apply Now?
EV adoption in Fairfax County is accelerating. The county’s Climate Action Plan targets 15% of all car registrations tied to electric vehicles by 2030, compared to roughly 2% today. That growth is coming to your community’s parking lot whether you plan for it or not.
Communities that already have EV charging infrastructure are more attractive to buyers and renters. Charging is becoming an expected amenity, not a nice-to-have. And the financial case has never been stronger:
- Grant amounts were just increased in 2025
- Dominion’s stacked incentive remains in place
- Permit fees for EV charger installations in Fairfax County have been waived
The time to act is while the support structure is fully funded and in place.
Why Work with Blue Whale EV?
Blue Whale EV is a licensed EV charging contractor serving Fairfax County and all of Northern Virginia. We specialize in the exact type of project Charge Up Fairfax supports: Level 2 charger installations in shared parking for HOAs, condos, nonprofits, and places of worship.
What that means for your organization:
- One contractor handles everything. Equipment selection, electrical upgrades, permitting, installation, and post-install documentation for your grant reimbursement.
- Experience with Charge Up Fairfax. We know how the program works and can help your board navigate the process from application through installation.
- Incentive stacking guidance. We help you layer Charge Up Fairfax with Dominion Energy’s Level 2 program to minimize your out-of-pocket cost.
Frequently Asked Questions About Charge Up Fairfax
What is the Charge Up Fairfax program?
Charge Up Fairfax is a Fairfax County program that provides free technical assistance and reimbursement grants to help HOAs, condo associations, nonprofits, and places of worship install Level 2 EV charging stations in shared parking areas. It is managed by the Fairfax County Office of Environmental and Energy Coordination (OEEC).
Who is eligible for Charge Up Fairfax?
Any HOA, condo association, cluster association, co-op, nonprofit, or place of worship in Fairfax County with shared parking is eligible to apply. Eligibility was expanded in 2025 to include places of worship and nonprofits in addition to residential community associations.
How much money does Charge Up Fairfax provide?
Organizations can receive a reimbursement grant of up to $8,000 for standard installations, or up to $12,000 for organizations located in equity-designated areas according to the Fairfax County Vulnerability Index. Grant amounts were increased in 2025.
Can you stack Charge Up Fairfax with Dominion Energy incentives?
Yes. Charge Up Fairfax can be combined with Dominion Energy’s Level 2 EV Charging Program, which covers approximately 50% of electrical make-ready costs. On a $30,000 project, stacking both incentives can reduce your organization’s out-of-pocket cost to as little as $5,000.
Is there a deadline to apply for Charge Up Fairfax?
No. As of 2025, Charge Up Fairfax accepts applications on a rolling basis with no deadline. Applications are free to submit, and the county responds within 10 to 15 business days.
What does the free feasibility study include?
The feasibility study is conducted by an engineering firm at no cost to your organization. It includes an assessment of your parking layout and power sources, estimated installation costs, recommended charger locations, and required electrical work. There is no obligation to proceed after receiving the study.
How long does the Charge Up Fairfax process take?
The full process, from application to completed installation, typically takes several months to about a year depending on your organization’s timeline, contractor scheduling, and permitting. The application and feasibility study phases move quickly; the installation timeline depends on scope and contractor availability.
What type of EV chargers does Charge Up Fairfax support?
Charge Up Fairfax supports Level 2 EV charging stations, which can charge an EV from 0% to 80% in approximately 4 to 10 hours. These are the standard for community and commercial charging installations and are compatible with all major EV makes and models.
Does my HOA need to pay for installation upfront?
Yes. Grants are awarded on a reimbursable basis, meaning your organization pays for the installation first and receives the grant reimbursement from the county after the chargers are installed and operational.
Who installs EV chargers for the Charge Up Fairfax program in Fairfax County?
Organizations accepted into Charge Up Fairfax hire a licensed electrical contractor to handle permitting, electrical upgrades, equipment selection, and installation. Blue Whale EV specializes in EV charging station installation in Fairfax County and across Northern Virginia, and has experience navigating the Charge Up Fairfax program from application through installation. Get in touch to discuss your project.