A shared place to charge at Blueberry Hill.

Prepared byBlue Whale EV
Sample17 responses
PropertyBlueberry Hill CoHousing Association
MethodGoogle Forms survey, June 18-22, 2026

The community has already asked for charging.

17 residents responded across 19 homes, an 89.5% voluntary response rate. Ten already drive an EV or plug-in hybrid, and 13 rate their next vehicle 7 or higher for an EV or plug-in hybrid. Existing demand supports a four-charger planning case.

Question 1

Do you currently drive an electric or plug-in hybrid vehicle?

10 of 17 respondents already drive an EV or plug-in hybrid.

10 of 17 respondents already drive electric or plug-in hybrid.

Question 2

How likely are you to consider an EV or plug-in hybrid as your next vehicle?

High intent, 13 of 17 1 1 1 2 3 2 4 5 6 2 7 1 8 1 9 9 10 Average 7.8 1 Not at all 10 Definitely

13 of 17 rated their next vehicle 7 or higher on a 10-point scale.

13 of 17 rate a future EV or plug-in hybrid 7 or higher.

Question 3

If chargers were available on-site, how often would you use them?

Daily 4 A few times a week 7 Once per week 1 Rarely or never 5

No response category was empty.

12 of 17 respondents expect to use on-site charging at least once a week.

12 of 17 would use on-site charging at least once a week.

Question 4

Would EV chargers make you more likely to keep living here?

Yes 9 (53%), indifferent 6, no 2.

Nine residents said chargers would make them more likely to keep living here.

9 of 17 say charging would make them more likely to stay.

Existing demand calls for four chargers.

Demand is already present

Ten respondents already own an EV or plug-in hybrid. Seven more rate their next vehicle 7 or higher despite not driving one today. The proposal is a response to current residents, not a bet on distant demand.

The site walk sets the final scope

Four chargers are the budgetary planning case. This report is not a quote and does not fix charger locations, brand, electrical scope, driver pricing, or final project price. Blue Whale EV will confirm those items during a site walk, then issue a written quote.

Please plan to add EV charging in north lower lot

Blueberry Hill CoHousing Association resident, full quote in Voices

Residents raised the practical questions too.

These are the written comments from the survey, kept as submitted.

Support

Details to work through

A concern to solve

Set the rules before the equipment arrives

Access control and driver billing should be settled with the site design. The community can choose a user-funded price so residents who do not charge are not billed for charging.

EV ownership in Fairfax County is still rising.

The closest public Level 2 charging starts 1.6 miles away.

Four of the nearest EVpin-listed sites sit outside the neighborhood, from Wolf Trap to Parkridge.

Market context

47,446 EVs registered in Fairfax County as of July 2026. 70,323 projected for 2027.

40,000 50,000 60,000 70,000 You are deciding here (July 2026) Projected 47,446 Jul 2026 70,323 Dec 2027

EVpin reports 47,446 registered BEVs and PHEVs in Fairfax County, up 23% year over year as of July 2026. Its projection is 70,323 in 2027. Source: Experian Automotive via EVpin.

9.07% of registered vehicles in the ZIP code are EVs, as of July 2026.
77% of people in the ZIP can afford an entry-level EV, as of July 2026.

Fairfax County has 47,446 registered BEVs and PHEVs as of July 2026, up 23% year over year. EVpin projects 70,323 in 2027. EVpin's nearest listed public Level 2 sites start 1.6 miles away, so there is no listed public charger immediately around the community.

EVpin rates the address 3.4 out of 5, Moderate, for utilization projection as of July 2026. Dominion Energy serves the property and the Town of Vienna is the permitting jurisdiction.

EVpin lists five possible incentives, including Dominion Energy's Level 2 program. Eligibility and funding must be confirmed. This calculator uses $0 incentives, so no rebate is needed for the planning case.

Plan around four shared chargers.

Existing demand supports a four-port planning case.

Survey demand supports a four-port Level 2 planning case. Final charger locations, equipment, electrical configuration, and project price will be determined during the site walk and set in a written Blue Whale EV quote.

Dominion can change the project math.

EVpin identifies Dominion Energy as the serving utility. Its Level 2 Charging Program may reduce eligible make-ready construction and installation costs, subject to Dominion's program review and a signed agreement.

50% upfront make-ready incentive

Dominion's program materials describe a 50% upfront incentive for eligible EV charging construction and installation work, commonly called make-ready infrastructure.

Remaining eligible costs move to the bill

Instead of treating all qualifying work as an upfront project cost, the remaining program costs can be paid through monthly on-bill payments over the program term.

Eligibility needs a live confirmation

Dominion must confirm the customer type, site authority, minimum qualifying stations, site readiness, current funding, pricing, and contract terms before Blueberry Hill relies on the program.

Program description adapted from Dominion Energy's public Level 2 Charging Program materials and the prior Kingstowne report. Final eligibility and economics require Dominion's written confirmation.

The whole build in two numbers.

One set of inputs feeds both of Blue Whale EV's models. What ownership needs from them is short: how fast the chargers pay for themselves, and how much value the amenity adds to the asset.

Charging model

$
$
$
$
hr
kW

Community context

$
%
%

Payback period

Charging alone nets per year against project cost.

Asset value created

$1.40M

Not capitalized for this co-housing ownership model.

Payback timeline

0246810

NOI uplift, annual

Vacancy savings
Charging net

Total NOI uplift / year

Cut utilization and retention assumptions in half and this still pencils: payback stretches to 6.9 years and the asset gains $700K.

Budgetary estimate only, not a binding quote. It models four charging ports and a $40,000 planning allowance. Final locations, charger brand, access rules, driver pricing, and scope will be confirmed at the site walk and set in a written Blue Whale EV quote. Drag any input and the math updates instantly.

How the math works

These formulas use the values currently shown in the calculator. They are a budgetary planning model, not a binding quote or guarantee.

Where the value comes from

For Blueberry Hill, the financial case is charging revenue against the budgetary project allowance. The calculator does not claim vacancy savings or a capitalized asset value because this is a co-housing community. At the planning inputs, four ports net about $20,148 per year and repay the $40,000 allowance in about two years.

This is the second and final planning caveat: the four-port, $40,000 model is a budgetary estimate, not a binding quote. Final charger locations, brand, electrical scope, driver pricing, and project price require a site walk and written Blue Whale EV quote. No incentives are included. Rent, cap rate, and vacancy improvement are set to zero because they do not apply here.

The next 90 days.

Proposed next step

Schedule a site walk with Blue Whale EV.

We will walk the common house and north lower lot with your team, confirm the practical charger locations, and document the work needed for a buildable first phase.

I.

Walk the Site

Meet Blue Whale EV on-site to review electrical capacity, charger locations, routing, and the conditions that shape the first phase.

II.

Receive the Quote, Plan, and Updated Report

We will turn the site findings into a project quote and installation plan, then update this report with the confirmed scope and economics.

III.

Review and Sign

Ownership reviews the final proposal. Once the scope and price are approved, sign the agreement to authorize the work.

IV.

Get to Work

After the agreement is signed, Blue Whale EV begins permitting, utility coordination, equipment ordering, and installation scheduling.

Have questions?

Reach out to Zach Hogan at Blue Whale EV for follow-up on the findings or next-step planning.

zhogan@bluewhaleev.com
DEC9Due 3 PM ET

$16.5M for EV charging in Maryland.

MEA's Community EVSE Grant is open to Maryland businesses, nonprofits and local governments. We can help you apply.

91% success rateon the projects we helped prepare last round

Applications close in

69days00hrs00min00sec