17 residents responded across 19 homes, an 89.5% voluntary response rate. Ten already drive an EV or plug-in hybrid, and 13 rate their next vehicle 7 or higher for an EV or plug-in hybrid. Existing demand supports a four-charger planning case.
10 of 17 respondents already drive an EV or plug-in hybrid.
10 of 17 respondents already drive electric or plug-in hybrid.
13 of 17 rated their next vehicle 7 or higher on a 10-point scale.
13 of 17 rate a future EV or plug-in hybrid 7 or higher.
No response category was empty.
12 of 17 respondents expect to use on-site charging at least once a week.
12 of 17 would use on-site charging at least once a week.
Yes 9 (53%), indifferent 6, no 2.
Nine residents said chargers would make them more likely to keep living here.
9 of 17 say charging would make them more likely to stay.
Ten respondents already own an EV or plug-in hybrid. Seven more rate their next vehicle 7 or higher despite not driving one today. The proposal is a response to current residents, not a bet on distant demand.
Four chargers are the budgetary planning case. This report is not a quote and does not fix charger locations, brand, electrical scope, driver pricing, or final project price. Blue Whale EV will confirm those items during a site walk, then issue a written quote.
Please plan to add EV charging in north lower lot
Blueberry Hill CoHousing Association resident, full quote in VoicesThese are the written comments from the survey, kept as submitted.
Access control and driver billing should be settled with the site design. The community can choose a user-funded price so residents who do not charge are not billed for charging.
Four of the nearest EVpin-listed sites sit outside the neighborhood, from Wolf Trap to Parkridge.
EVpin reports 47,446 registered BEVs and PHEVs in Fairfax County, up 23% year over year as of July 2026. Its projection is 70,323 in 2027. Source: Experian Automotive via EVpin.
Fairfax County has 47,446 registered BEVs and PHEVs as of July 2026, up 23% year over year. EVpin projects 70,323 in 2027. EVpin's nearest listed public Level 2 sites start 1.6 miles away, so there is no listed public charger immediately around the community.
EVpin rates the address 3.4 out of 5, Moderate, for utilization projection as of July 2026. Dominion Energy serves the property and the Town of Vienna is the permitting jurisdiction.
EVpin lists five possible incentives, including Dominion Energy's Level 2 program. Eligibility and funding must be confirmed. This calculator uses $0 incentives, so no rebate is needed for the planning case.
Existing demand supports a four-port planning case.
Survey demand supports a four-port Level 2 planning case. Final charger locations, equipment, electrical configuration, and project price will be determined during the site walk and set in a written Blue Whale EV quote.
EVpin identifies Dominion Energy as the serving utility. Its Level 2 Charging Program may reduce eligible make-ready construction and installation costs, subject to Dominion's program review and a signed agreement.
Dominion's program materials describe a 50% upfront incentive for eligible EV charging construction and installation work, commonly called make-ready infrastructure.
Instead of treating all qualifying work as an upfront project cost, the remaining program costs can be paid through monthly on-bill payments over the program term.
Dominion must confirm the customer type, site authority, minimum qualifying stations, site readiness, current funding, pricing, and contract terms before Blueberry Hill relies on the program.
Program description adapted from Dominion Energy's public Level 2 Charging Program materials and the prior Kingstowne report. Final eligibility and economics require Dominion's written confirmation.
One set of inputs feeds both of Blue Whale EV's models. What ownership needs from them is short: how fast the chargers pay for themselves, and how much value the amenity adds to the asset.
Charging model
Community context
Payback period
Charging alone nets per year against project cost.
Asset value created
$1.40M
Not capitalized for this co-housing ownership model.
Payback timeline
NOI uplift, annual
Total NOI uplift / year
Budgetary estimate only, not a binding quote. It models four charging ports and a $40,000 planning allowance. Final locations, charger brand, access rules, driver pricing, and scope will be confirmed at the site walk and set in a written Blue Whale EV quote. Drag any input and the math updates instantly.
For Blueberry Hill, the financial case is charging revenue against the budgetary project allowance. The calculator does not claim vacancy savings or a capitalized asset value because this is a co-housing community. At the planning inputs, four ports net about $20,148 per year and repay the $40,000 allowance in about two years.
This is the second and final planning caveat: the four-port, $40,000 model is a budgetary estimate, not a binding quote. Final charger locations, brand, electrical scope, driver pricing, and project price require a site walk and written Blue Whale EV quote. No incentives are included. Rent, cap rate, and vacancy improvement are set to zero because they do not apply here.
We will walk the common house and north lower lot with your team, confirm the practical charger locations, and document the work needed for a buildable first phase.
Meet Blue Whale EV on-site to review electrical capacity, charger locations, routing, and the conditions that shape the first phase.
We will turn the site findings into a project quote and installation plan, then update this report with the confirmed scope and economics.
Ownership reviews the final proposal. Once the scope and price are approved, sign the agreement to authorize the work.
After the agreement is signed, Blue Whale EV begins permitting, utility coordination, equipment ordering, and installation scheduling.
Reach out to Zach Hogan at Blue Whale EV for follow-up on the findings or next-step planning.