Anonymous Property residents are getting ready to go electric.

Prepared byBlue Whale EV
Sample21 responses
PropertyAnonymous Property
MethodGoogle Forms survey, June-July 2026

A small sample with a clear direction.

Twenty-one residents responded, a 4.5% voluntary response rate across 469 units, which is normal turnout for an amenity survey. Every one of those responses is a lease decision.What stands out is the trend: two-thirds of respondents expect their next vehicle to be electric, and just over half say on-site charging would affect whether they renew.

Question 1

Do you currently own an EV or plug-in hybrid?

1 in 4 already drives electric.

5 of 21 respondents own an EV or plug-in hybrid today. Community-wide the count is likely higher.

Question 2

How likely is your next vehicle to be an EV?

Two-thirds say their next car is electric.

High intent, 14 of 21 6 1 2 1 3 4 5 6 1 7 5 8 2 9 6 10 Average 6.4 1 Not at all 10 Definitely

14 of 21 rated their next vehicle 7 or higher on a 10 point scale.

Question 3

How often would you use on-site chargers?

Two-thirds would plug in weekly or more.

Daily 4 A few times a week 10 Never 7

Once a week: 0 responses.

14 of 21 would plug in at least a few times a week. The 7 who said never are the residents not expecting an EV soon.

Question 4

Would on-site charging affect whether you renew your lease?

Half say it affects renewal.

Yes 11 (52%), indifferent 5, no 5.

Eleven residents tied their renewal decision to on-site charging.

Demand is running ahead of ownership.

Signal: demand is future-facing

Current ownership is modest at 5 residents (24%), but intent runs well ahead of it: 67% expect their next vehicle to be electric, and just over half say charging affects whether they renew. In transit-rich NoMa, on-site charging reads as an amenity that both keeps EV-minded residents and attracts new ones.

Signal: keep it right-sized and fair

The sample is small (21 responses) and two residents flagged cost fairness. Treat this as justification for a modest first phase, and get the operating model right: a user-funded price so non-EV residents never subsidize the chargers.

It would not seem fair to distribute the charge to folks who do not have EVs.

Anonymous Property resident, full quote in Voices

What residents told you.

Only two residents left written comments. Both appear here in full, and both land on the same point: who pays. That is the operating question to settle up front, and Blue Whale EV's user-funded model answers it directly.

The operating question that matters most: who pays

The answer built into the model

EV drivers are the only residents who ever pay anything. They pay directly for what they use, per kWh at the port, and nobody else is billed a cent. No amenity fee, no shared charge, no cost added to anyone else's rent, which is exactly the fairness both comments ask for.

Why DC supports this build.

Seven apartment buildings within three blocks already charge.

Every pin below is a rental competitor inside a 10 minute walk of Anonymous Property, and every one of them offers residents on-site Level 2 charging. Anonymous Property does not. A prospective tenant comparing these buildings sees that difference on the amenity list.

Market context

17,537 EVs registered in DC at the end of 2025. 25,296 projected by the end of 2027.

10,000 15,000 20,000 25,000 You are deciding here (July 2026) Actual Projected 13,918 17,537 25,296 Dec 2024 Dec 2025 Dec 2027

Solid line is registered vehicles through December 2025, the most recent count, up 26% over the prior year. The dashed line is Experian's projection, a further 44% by December 2027. Source: Experian Automotive via EVpin.

6.23% EV adoption in the 20002 zip code, ahead of the District's 5.8%. Both figures as of December 2025.
38% Of zip-code residents can afford an entry-level EV, which is what turns interest into purchases.

Two things make this address work. Adoption in the 20002 zip code already runs ahead of the District as a whole, and the registration curve is still climbing steeply. Pepco is the utility, and Washington, D.C. handles permitting.

EVpin scores this address HIGH (4 of 5) for charger utilization.

EVpin shows no rebates or incentives available for this address, so the profitability model assumes $0 grants, the conservative case. Source: EVpin market report for 1160 First Street NE.

Start with 4 ports.

Current demand fills 3 ports. We recommend 4.

Conduit installed during this build is cheap. The same conduit installed after the garage is finished means cutting concrete. Recommended hardware is Xeal Level 2: multifamily-built, per-driver billing, remote management.

The whole build in two numbers.

One set of inputs feeds both of Blue Whale EV's models. What ownership needs from them is short: how fast the chargers pay for themselves, and how much value the amenity adds to the asset.

Charging model

$
$
$
$
hr
kW

Property model

$
%
%

Payback period

3.5 yr

Charging alone nets $11,563 per year against project cost.

Asset value created

$1.40M

Built on $76,848 per year of NOI uplift, capitalized.

Payback timeline

3.5 yr
0246810

NOI uplift, annual

Vacancy savings $65,285
Charging net $11,563

Total NOI uplift $76,848 / year

Cut utilization and retention assumptions in half and this still pencils: payback stretches to 6.9 years and the asset gains $700K.

Defaults are Blue Whale EV's directional model for this property pending a firm quote. Drag anything; the math updates instantly.

How the math works

These formulas use the values currently shown in the calculator. They are a directional operating model, not a quote or guarantee.

Where the value comes from

Charging turns a small profit. The number that moves the asset is retention: on a 469-unit rent roll, a 0.4% vacancy improvement is worth far more than the chargers earn. That tracks the survey's retention signal, where just over half of respondents said charging affects whether they renew. Turning over a single $2,900 unit costs more than a month of vacancy plus make-ready. If charging keeps even two or three EV-driver leases a year, retention alone outearns the chargers.

Unit count and average rent come from public listings, and the $40,000 build cost stands in until Blue Whale EV issues a firm quote. Confirm both before ownership decides.

Your next step.

What a live report includes

Your report turns the findings into a practical timeline.

For a real property, this section lays out the recommended first phase, who needs to review it, the quote and operating decisions to settle, and the path from site walk to installation. It gives ownership a clear sequence instead of a stack of survey results.

Request your report

This is an anonymized example. Request an EV Charging Interest Report for your property and Blue Whale EV will build the actual findings, timeline, and next steps.

Request Your EV Report
DEC9Due 3 PM ET

$16.5M for EV charging in Maryland.

MEA's Community EVSE Grant is open to Maryland businesses, nonprofits and local governments. We can help you apply.