90-day free trial
Mobile DC fast charger trial.
no install.
no wait.
Blue Whale EV is offering a 90-day mobile DC fast charger trial with the Lincoln Electric Velion® 50kW for fleets that need surge capacity, mobile DC fast charging, or a flexible path to fleet electrification with fewer barriers than permanent DC fast charging installations.

Who it is built for
Who is the mobile DC fast charger trial good for?
Auto Dealerships
EV inventory cannot sit at 20 percent. The Velion® 50kW lets dealerships top off arrivals, prep test drives, and handle customer delivery charging without waiting on utility upgrades or permanent DCFC construction.
Fleet Management
Delivery, service, and shuttle fleets hit exception days where a vehicle returns low and needs to be back out fast. The Velion® 50kW supplies surge capacity at your existing depot so an L2-only site can absorb peak demand.
Public Sector and Education
School districts, transit agencies, and municipal fleets use the Velion® 50kW to bridge electric bus and light-duty charging during pilots, route expansions, or while permanent DC fast charging is in design. Buy America compliant and Sourcewell ready.

Velion® 50kW mobile DCFC
The mobile DC fast charger built for real fleet work.
Big power. Small footprint. Total flexibility.
Request the trial
Tell us where fast mobile charging would help your fleet.
Submit the basics and Blue Whale EV will follow up to discuss trial fit, timing, power access, and the next practical step.
FAQ
Common trial questions.
How much does the 90-day mobile DC fast charger trial cost?
The trial itself is free for qualified organizations. Blue Whale EV covers the unit for the 90-day evaluation period. Customers are responsible for the electricity used during charging and for site preparation if any minor electrical work is needed to reach the existing 480V 3-phase service. There is no obligation to purchase at the end of the trial.
Does the Velion® 50kW require permanent installation or trenching?
No. The whole point of the mobile DC fast charger trial is to avoid permanent trenching, conduit runs, and building permits. The Lincoln Electric Velion® 50kW arrives on wheels with a forklift pocket and rolls to your existing 480V 3-phase power source. Site conditions still need to be confirmed before deployment so the unit operates safely and productively in your environment, but no permanent civil work is required to use it.
What power does the Velion® 50kW charger need to operate?
The Velion® 50kW requires 480VAC plus or minus 10 percent, 60Hz, 3-phase input, drawing up to 64A at full 50kW output. Not every facility has this exact service available where charging would actually take place, so the qualification step exists to confirm power access matches the Velion® 50kW's input requirements before a unit is shipped. If your site has a panel that already serves welders, large HVAC equipment, or industrial machinery, you likely have what is needed.
How fast will the Velion® 50kW charge an EV?
At full 50kW output, most light-duty EVs can add roughly 150 to 200 miles of range in about an hour, depending on the vehicle's onboard charging curve, battery state of charge, and ambient temperature. The Velion® 50kW is selectable to 12.5kW, 25kW, or 50kW, giving operators flexibility for slower top-up sessions or full surge charging when a vehicle needs to return to service quickly.
Which vehicles and connectors does the Velion® 50kW support?
The Velion® 50kW supports CCS1 and NACS cable options in either 15-foot or 25-foot lengths, which covers the vast majority of EVs sold in North America including Ford, GM, Stellantis, Hyundai/Kia, Rivian, Tesla, and most electric school buses and delivery vans. During trial qualification, Blue Whale EV confirms the connector type and cable length against the fleet being tested so the configuration matches your vehicles on day one.
How long does it take to deploy the Velion® 50kW on-site?
Once site qualification is complete and a delivery date is scheduled, the unit can be rolled into place and operational in a single afternoon. There is no permitting wait, no concrete pad, and no utility upgrade required. Most customers go from signed trial agreement to first charge in two to four weeks, with the longest lead time being the qualification call and shipping logistics.
Can the Velion® 50kW be moved between sites during the trial?
Yes. The unit is built to be mobile. Wheels, a forklift pocket, and an optional roll cage make it straightforward to relocate between facilities within the same organization during the 90-day period. Each new location does need to meet the same 480V 3-phase power requirement, so customers operating multi-site pilots should plan the rotation in advance.
Is the Velion® 50kW safe to operate outdoors and in winter weather?
The Velion® 50kW is engineered for outdoor industrial use across a wide operating temperature range. It is ENERGY STAR certified and meets the safety standards expected of fixed DC fast charging equipment. As with any DCFC, extreme cold can reduce a vehicle's accepted charge rate due to battery chemistry, but the charger itself is designed to operate reliably in the climates where North American fleets run year-round.
Who maintains the unit and provides support during the trial?
Blue Whale EV coordinates delivery, commissioning, and ongoing support during the 90-day evaluation. The unit ships with a 3-year standard warranty from Lincoln Electric, and Blue Whale EV is the local point of contact for any operational questions, service needs, or training requests. Most teams need less than an hour of onboarding to start charging vehicles confidently.
Is the Velion® 50kW Buy America compliant for federally funded projects?
Yes. The Velion® 50kW meets Build America Buy America (BABA) requirements, which makes it eligible for federally funded EV charging projects including NEVI corridor funding, Clean School Bus Program awards, FTA Low-No grants, and similar federal sources. This is a meaningful advantage for school districts, transit agencies, and municipal fleets that have grant dollars tied to domestic content rules.
How does buying a Velion® 50kW through Sourcewell work after the trial?
Blue Whale EV holds Sourcewell Contract #021825-BWL, a cooperative purchasing agreement that lets public agencies and qualifying nonprofits skip the competitive bid process. After the trial, qualified buyers can issue a purchase order against the contract directly. This typically compresses a six-to-nine month procurement cycle into a few weeks.
What happens at the end of the 90-day mobile DC fast charger trial?
At the end of the 90-day evaluation period, Blue Whale EV reviews the results with your team. Purchase options include a new Velion® 50kW unit through Sourcewell Contract #021825-BWL with no competitive bid required, a different Lincoln Electric charging solution from Blue Whale EV's Lincoln Electric solutions page, or simply returning the unit. The Velion® 50kW trial is structured so you can make an informed infrastructure decision with real operational data, not a sales pitch.

