How Arlington County Procured EV Chargers Without Issuing a New RFP

Project Summary: Compliant EV Charging for a Government Facility

Arlington County, Virginia, worked with Blue Whale EV to bring six new Level 2 chargers online at the Arlington County Courthouse complex. By using the county’s existing competitively bid contract, the project moved forward without the need for a new RFP—saving time, reducing costs, and ensuring full procurement compliance.

Blue Whale EV handled the project from design through commissioning, including electrical work, permitting coordination, and activation.

The Challenge: Procurement Delays, Infrastructure Complexity, and Dual-Use Requirements

🏛️ Government Procurement Without Delays

Most municipal projects face months of delay due to complex procurement processes and public bidding requirements. Arlington County needed a compliant way to move forward without getting stuck in another lengthy RFP cycle.

🏗️ Infrastructure Barriers

The courthouse site required new power runs and structural work. Feeders needed to be pulled to a dedicated 200-amp panel, and the installation involved boring under the street and pouring new concrete pads—all while keeping courthouse operations uninterrupted.

🚘 Fleet & Public Use Balance

Chargers had to serve both public visitors and county fleet vehicles. Placement, signage, and network setup all needed to ensure clear access and reliable uptime for both audiences.

The Solution: Contract-Based Procurement For A Turnkey EV Charger Installation

📄 Piggybacking on an Existing Contract

Arlington County leveraged its pre-competed contract vehicle with Blue Whale EV to move forward immediately—no new RFP required. By doing so, the county avoided months of bid prep, review, and administrative delay while keeping costs fully competitive.

The same option is available to any government entity in all 50 states. Through Blue Whale EV’s bridgeable contract, agencies can skip the lengthy procurement cycle, saving significant time and money while keeping their EV infrastructure projects moving forward fast and compliantly.

🧰 Comprehensive Turnkey Delivery

Blue Whale EV coordinated every step of the installation, from design to activation. The team installed three Blink Series 8 dual-port chargers (six total plugs), ran conduit from the building’s electric room, bored under the street, set bollards, poured pads, and wired to a new 200-amp panel. 

🧭 Permitting Integration

Blue Whale EV worked in lockstep with county inspectors and permitting offices to ensure a smooth process—aligning with Arlington’s own permitting schedule and documentation requirements.

The Results: Faster Deployment, Public Access, and Future Scalability

⚡ Operational in Weeks, Not Months

The courthouse now hosts six public/fleet charging stations that came online faster and more cost-effectively than a traditional procurement route would have allowed.

👥 Public Visibility & County Efficiency

The new chargers serve both county fleet vehicles and public visitors—reducing emissions, demonstrating leadership in clean energy, and contributing to Arlington’s sustainability goals.

🔁 Scalable Framework for Future Projects

By leveraging a bridgeable contract, the county now has a repeatable pathway to add charging infrastructure at other government facilities statewide—without the red tape.

Considering EV Charging for Your Municipality?

Government permitting and procurement can be tough—but it doesn’t have to slow you down.

Blue Whale EV’s bridgeable contract allows public agencies in all 50 states to install EV chargers quickly, compliantly, and cost-effectively—without issuing a new bid.

👉 Contact us to learn how your agency can leverage the same streamlined approach Arlington County used to get their courthouse chargers online fast.

DEC9Due 3 PM ET

$16.5M for EV charging in Maryland.

MEA's Community EVSE Grant is open to Maryland businesses, nonprofits and local governments. We can help you apply.

91% success rateon the projects we helped prepare last round

Applications close in

69days00hrs00min00sec